Skip to main content

Market: Mining

Solution: Redeployable integrated full turnkey solution accommodating 150 men

These specially designed 10 x 10 person fly camps are capable of frequent manual relocation, every two weeks, by helicopter or light pick-up trucks. Six men alone can lift the individual components of the camp. The purpose of this camp is to allow the survey teams working on the centre-line of the proposed railway line to keep track with the progress of the work taking place.

The camp composition consisted of three fully equipped soft-walled shelters for the use of:

  • Dormitory style air conditioned units
  • Kitchen or air-conditioned diner
  • Ablution with showers, toilets and wash basins

The infrastructure support systems included:

  • All internal and external water, sewage and electrical reticulation
  • A water purification plant with reverse osmosis
  • Biological sewerage treatment plant
  • Synchronised silent generators
  • Lightning protection, and
  • Redeployable packaging.