Market: Mining industry
Solution: Integrated fully turnkey pioneering camp accommodation
A mining company operating in Niger ordered a fully integrated redeployable turnkey construction camp capable of housing all employees working on-site. The camp was shipped to site where the Weatherhaven RCS team assisted with installation. It was required to provide:
- Sleeping accommodation
- A kitchen
- Diner structures
- Offices
- External electrical reticulation
- Containerised water purification plant with reverse osmosis and storage, and
- A biological sewage treatment plant with parameter fencing.