Weatherhaven RCS’s work with SA Military Health makes its mark at the UN. The doctrinal and development work done by the SANDF, using Weatherhaven RCS’s re-deployable medical posts, are a part of a programme that has become a benchmark recognized and accepted by the UN.
The partnership with Denel/Mechem MOU has led to an opportunity for Weatherhaven RCS to supply our clients with a one stop service. Through our memorandum of understanding with Denel/Mechem, we are now able to provide full turnkey camps, including camp management. Therefore, no matter how remote our clients may be, we can service their every need.
Market: Military
Solution: HERCon (Hard-Walled Structures)
Weatherhaven RCS supplied and installed hard-walled solutions for the SANDF Border Post camp in Sand River. The deployment consisted of accommodation and ablution units as well as a water treatment plant of the base. Weatherhaven RCS is currently performing the camp maintenance.
Market: Military hospitals
Solution: Upgrade and refurbish of UN Level 2 Medical Field
Weatherhaven RCS was contracted to upgrade and refurbish a UN Level 2 Medical Field Hospital which Weatherhaven International had supplied to the South African Medical Health Services. This hospital originally operated in Africa during peacekeeping operations. It consisted of Mobile Expandable Container Configuration (MECC™) shelters together with soft-walled PVC shelters, which would be used for:
- Kitchens
- Ablutions
- Dining
- Laundry
- X-Ray, ICU, OR, CSR
- Pharmacy, and
- A resuscitation area.
Market: Military and Navy
Solution: Hard-Walled Structures
The Brazilian Navy ordered a HERCon™ temporary camp from Weatherhaven International. This camp was installed in Antarctica and consisted of:
- 12-person accommodation
- Ablution units
- Laundry
- Office and communication room
- Medical facility
- Corridors connecting all areas
- General storage areas
- A structure for dry clothes
- Workshop
- Chemical laboratory, and
- Containerised cold storage.
The camp was also required to have external electrical reticulation including power generation, a containerised water purification plant and storage, as well as a sewerage treatment plant with an incinerator. These units passed through eight ports before arriving in Antarctica.
Market: Mining industry
Solution: Integrated fully turnkey pioneering camp accommodation
A mining company operating in Niger ordered a fully integrated redeployable turnkey construction camp capable of housing all employees working on-site. The camp was shipped to site where the Weatherhaven RCS team assisted with installation. It was required to provide:
- Sleeping accommodation
- A kitchen
- Diner structures
- Offices
- External electrical reticulation
- Containerised water purification plant with reverse osmosis and storage, and
- A biological sewage treatment plant with parameter fencing.
Recent Comments